The Hong Kong–Zhuhai–Macau Bridge (HZMB), is a 55-kilometre bridge–tunnel system ______ of cable-stayed bridges, an undersea tunnel, and four artificial islands.
A. consisted B. having consisted C. consisting D. being consisted
高三英语单项填空困难题
The Hong Kong–Zhuhai–Macau Bridge (HZMB), is a 55-kilometre bridge–tunnel system ______ of cable-stayed bridges, an undersea tunnel, and four artificial islands.
A. consisted B. having consisted C. consisting D. being consisted
高三英语单项填空困难题查看答案及解析
阅读下面短文,在空白处填写1个适当的单词或括号内单词的正确形式。
The Hong Kong-Zhuhai-Macau Bridge(HZMB),a 55-kilometre bridge-tunnel system,1. (consist)of a series of three cable-stayed bridges,an undersea tunnel,and four artificial islands.It is both the longest sea crossing and the longest fixed link on earth,another 2. (significance)project.The HZMB,3. connects Hong Kong,Macau,and Zhuhai-three major cities on the Pearl River Delta,crosses the Lingding and Jiuzhou channel.
The HZMB designed 4. (1ast)for 120 years was built with a cost of 126.9 billion yuan(US $18.77 billion).The cost of 5. (construct)the Main Bridge was estimated 6. 51.1 billion yuan(US $7.56 billion)shared among the governments of mainland China,Hong Kong and Macau.
7. (initial)set to be opened to traffic in late 2016,the structure was finally completed on 6 February 2018 and 8. (journalist)were subsequently given rides over the bridge.On 24 October 2018,the HZMB was opened to 9. public after its opening ceremony a day 10. (early)by Xi Jinping,General Secretary of the Communist Party of China.
高三英语语法填空简单题查看答案及解析
阅读下面材料,在空白处填入适当的内容(一个单词)或括号内单词的正确形式。
Hong Kong–Zhuhai–Macau Bridge is one of the most challenging constructions of its kind as well as the world’s 1.(long) sea-crossing bridge. Its life span 2.(set) at 120 years. It3. (reported) can stand magnitude-8 earthquake, scale-16 typhoon as well as the collision with 4.300,000-ton ship. The bridge is the national key project featured with strategic significance, large involvement, highly difficult level of construction, long construction time, high 5. (require) on technical design and environmental protection, many participant parties, complex management and coordination. Due to the long distances6.the cities, the project is actually a series of bridges and tunnels,7.(connect) by artificial islands. British newspaper “The Guardian” named the mega-structure one of 8. (it) “seven wonders of the modern world.”
It will be the first new land transport link between the east and west coasts of the Pearl River. The bridge will benefit the economic development of the whole of the Delta and create a regional transport network,9.(improve) upon 10.is considered to be a weak land transport network currently in place.
高三英语语法填空中等难度题查看答案及解析
阅读下面短文,在空白处填入1个适当的单词或括号内单词的正确形式。
The Hong Kong-Zhuhai-Macao Bridge (HZMB), the 1. (eight) wonder for the 21st century, opened on the morning of October 24th, 2018. The bridge links three areas, making 2. much more convenient to travel from one to another. Since opening, the three-hour drive 3. Hong Kong, Zhuhai and Macao 4. (shorten) to 30 minutes.
The project involved more than 400 new patents, broke seven world records, and featured 5. (independent) developed key techniques and design. After an 8-year struggle, the success of the HZMB achieves 6. several generations have been dreaming of, and amazes the whole world with its demonstration of perfect skills and high-level Chinese standards. The bridge is intended to be 7. (rely) for more than 120 years. From the Belt and Road Initiative to "Created in China", there is always a group of people 8. (provide) strong technical support for each of the country's huge projects. From the beginning in December 2009 to the day of the official opening, all 9. (walk) of life made great contributions to the design and construction of HZMB, contributing "10. (wise) of China".
高三英语语法填空中等难度题查看答案及解析
阅读下面短文,在空白处填入1个适当的单词或括号内单词的正确形式。
The Hong Kong-Zhuhai-Macao Bridge (HZMB), the 1. (eight) wonder for the 21st century, opened on the morning of October 24th, 2018. The bridge links three areas, making 2. much more convenient to travel from one to another. Since opening, the three-hour drive 3. Hong Kong, Zhuhai and Macao 4. (shorten) to 30 minutes.
The project involved more than 400 new patents, broke seven world records, and featured 5. (independent) developed key techniques and design. After an 8-year struggle, the success of the HZMB achieves 6. several generations have been dreaming of, and amazes the whole world with its demonstration of perfect skills and high-level Chinese standards. The bridge is intended to be 7. (rely) for more than 120 years. From the Belt and Road Initiative to "Created in China", there is always a group of people 8. (provide) strong technical support for each of the country's huge projects. From the beginning in December 2009 to the day of the official opening, all 9. (walk) of life made great contributions to the design and construction of HZMB, contributing "10. (wise) of China".
高三英语语法填空中等难度题查看答案及解析
阅读下面短文,在空白处填入1个适当的单词或括号内单词的正确形式。
The Hong Kong-Zhuhai-Macao Bridge (HZMB) , the 1.(eight) wonder for the 21st cmtuiy. opened on the morning of October 24th, 2018. The bridge links three areas, making 2.much more convenient to travel from one to another. Since opening, the three-hour drive 3.Hong Kong$ Zhuhai and Macao 4.( shorten) to 30 minutes.
The project involved more than 400 new patents ,broke seven world records and featured 5.(independent) developed key techniques and design. After an 8-year struggle, the success of the HZMB achieves 6. several generations have been dreaming of, and amazes the whole world with its demonstration of perfect skills and high-level Chinese standards. The bridge is intended to be 7. (rely) for more than 120 years. From the Belt and Road Initiative to "Created in Chi- na" , there is always a group of people 8. (provide) strong technical support for each of the country’s huge projects. From the beginning in December 2009 to the day of the official opening, all 9. (walk) of life made great contributions to the design and construction of HZMB, contribu- ting 10. (wise) of China".
高三英语语法填空中等难度题查看答案及解析
Hong Kong-Zhuhai-Macao Bridge will be the world's longest bridge over water when it1.(complete).The bridge is now2.construction and will be put to use by the end of this year.A journey by land,3.can take up to four hours,will be4.(great) shortened.Now it only takes as little as thirty minutes.
From an artificial island near Hong Kong International Airport,the structure5.(run) west to another artificial island in Macao,a6.(distant) of 55 kilometers,20 times the length d San Francisco's Golden Gate Bridge.7.total of 400,000 tons of steel were used in the project,equal to 60 times the steel used8.(build) the Eiffel Tower.
Engineers were faced with complex geological conditions and technical challenges.The building of the bridge combines the9.(late) engineering technology and design,enabling the structure to withstand a magnitude 8 earthquake,a super typhoon or a strike by a ship10.(weigh) 300,000 tons.According to historical data,most big, cross-sea bridges last 100 years while Hong Kong-Zhuhai-Macao Bridge is designed to last 120 years.
高三英语短文填空中等难度题查看答案及解析
_____ the opening ceremony of the Hong Kong-Zhuhai-Macao Bridge was President Xi Jinping accompanied by leading officials of Hong Kong, Macao and Guangdong province.
A. Attending B. Having attended
C. Attended D. To attend
高三英语单项填空中等难度题查看答案及解析
阅读下面短文,在空白处填入1个适当的单词或括号内单词的正确形式。
The Hong Kong-Zhuhai-Macao Bridge, the world's 1.(long) cross-sea bridge, enters the history of human engineering and connection as a point of pride upon 2.(it) opening to traffic at 9 am on Oct.24, 2018.
One day after the opening was announced at a ceremony 3.(hold) in Zhuhai , the bridge's ports in three different administrative regions started serving travelers around-the-clock , opening 24 hours a day, seven days a week.4.(ensure) faster boundary crossings for passengers, the Macao and Zhuhai ports jointly use a one-off immigration clearance model,5.allows travelers to queue up only once to finish both exit and entry procedures of the two cities in about 306.(second).
Apart7. private cars, taxis and goods vehicles, two types of public transportation -shuttle bus(班车)and cross-boundary coach --can also run on the HZMB. 8.frequency of shuttle buses is about 5-10minutes during peak hours. Booking tickets for the shuttle bus online in advance 9.(be)available since 9 am on Tuesday. With the bridge now in service, the traveling time between Zhuhai and Hong Kong International Airport will10.( shorten) from four hours to 45 minutes, and the time between Zhuhai and Hong Kong’s Container Terminals will be cut from 3. 5 hours to 75 minutes.
高三英语语法填空中等难度题查看答案及解析
83. It is said that Hong Kong will be joined _____ the mainland _____ a beautiful bridge on the sea in the near future.
A.by; with | B.with; by | C.by; to | D.to; by |
高三英语单项填空简单题查看答案及解析